Planning Approvalsby mayfair studio Free check
9am to 6pm Mon to Fri
hello@approvedplans.co.uk

Hillingdon Local Plan: adopted policies and emerging plans

Hillingdon’s adopted plan has strategic and detailed parts from 2012 and 2020. Its replacement is now in a new plan-making timetable, with a September 2026 Gateway 1 milestone still scheduled rather than completed.

Area
London Borough of Hillingdon, England
Official sources checked
Profile updated
Review status
AI-assisted source check. Professional planning review not completed.

Check the planning authority first

Hillingdon’s adopted policies apply within its administrative area. For airport, major infrastructure or boundary sites, establish the consent route as well as the borough boundary.

The council’s accessible planning-policy pages were on its pre.hillingdon.gov.uk subdomain at this check. This profile records that source location explicitly; links should be rechecked if the council migrates the pages.


Adopted development-plan documents

Read the relevant policy wording and map together. An unverified date is a gap in this profile, not a finding that a document has no legal effect.

  • London Plan 2021

    Adopted. March 2021 strategic plan.

    London-wide strategic policies. Read alongside the applicable borough development-plan documents and the relevant authority boundary.

    Plan period and recorded dates
    Plan period
    Not verified
    Adopted or made
    Exact date not verified
    Separate effective date
    Not verified
  • Local Plan Part 1: Strategic Policies

    Adopted. 2012 strategic plan.

    Borough-wide growth strategy and core policies, including a horizon to 2026. An end year in the plan is not itself a replacement adoption. Exact adoption day is left unverified here.

    Plan period and recorded dates
    Plan period
    To 2026
    Adopted or made
    Exact date not verified
    Separate effective date
    Not verified
  • Local Plan Part 2: Development Management Policies

    Adopted. January 2020.

    Adopted .

    Detailed policies, including DMHD1 for residential alterations and extensions and associated design material. Read the whole applicable policy and exceptions.

    Plan period and recorded dates
    Plan period
    Not verified
    Adopted or made
    Separate effective date
    Not verified
  • Local Plan Part 2: Site Allocations and Designations

    Adopted. January 2020.

    Adopted .

    Site-specific allocations and designations, used with the updated policies map. The council states that the 2020 Part 2 replaced the saved UDP policies.

    Plan period and recorded dates
    Plan period
    Not verified
    Adopted or made
    Separate effective date
    Not verified
  • West London Waste Plan

    Adopted. 2015 joint plan.

    Joint waste planning framework, separate from the borough-wide housing and design plan. The exact authority-specific adoption date has not been verified in this profile.

    Plan period and recorded dates
    Plan period
    To 2031
    Adopted or made
    Exact date not verified
    Separate effective date
    Not verified

Policies maps and site boundaries

The adopted-plan register links the policies map updated for the January 2020 designations and allocations.

Check the relevant designation and instrument, not just a colour on the map. In particular, the council publishes a borough-wide larger-rear-extension Article 4 page; an absence of a map flag is not enough to establish permitted development.


Emerging plans and examination progress

The May 2026 timetable is more specific than the older review page’s quarterly programme. It lists scoping consultation from 9 July to 21 August 2026 and Gateway 1 for 17 September 2026.

The following content-and-evidence consultation is scheduled for 5 November 2026 to 14 January 2027. Submission in November 2027 and consideration of adoption in May 2028 are forecasts.

No adoption or examination hearing for the replacement is established by those future dates. The separate joint waste replacement is at Regulation 19 consultation.

  • New Hillingdon Local Plan

    Emerging: preparation under the 2026 timetable. May 2026 notice and timetable under the new plan-making system.

    The timetable records scoping in July–August 2026 and later consultation, gateways and examination. Future milestone dates are intentions, not evidence of completed stages.

    Plan period and recorded dates
    Plan period
    Not verified
    Adopted or made
    Not adopted in checked sources
    Separate effective date
    Not verified
  • West London Waste Plan update

    Emerging: Regulation 19 consultation. Regulation 19 proposed submission consultation, August 2026.

    Replacement waste plan consultation is listed for 4 August to 28 September 2026. It is not yet an adopted replacement.

    Plan period and recorded dates
    Plan period
    To 2041
    Adopted or made
    Not adopted in checked sources
    Separate effective date
    Not verified

Published milestones and events

Check the official programme before attending a hearing or relying on a deadline. A consultation, hearing or inspector's report is distinct from adoption. This page is a checked snapshot, not a live calendar.


Local design and supporting guidance

For residential extensions, start with adopted Part 2 DMHD1 and the document’s relevant design material. This profile does not elevate an old residential-extension SPD over the 2020 policies.

Check the actual Article 4 Direction, its schedule and current national rules before relying on the larger-rear-extension route. The council page uses historic GPDO references, so the page summary alone is not a full legal test.

    Design guidance does not establish that work is permitted development. Check the national rules, planning conditions and any relevant local restrictions.


    What to do for your property

    1. Open the adopted Part 2 map and identify site constraints.
    2. Read DMHD1 or other relevant development-management policies in full.
    3. Obtain the actual Article 4 instrument where a PD right may be restricted.
    4. Recheck whether Gateway 1 occurred after the scheduled September date.
    5. Keep proposed plan and waste-plan consultations separate from adopted policy.

    Keep the document versions, maps and date of your check with your project notes. A boundary, policy conflict or transition may need assessment by the relevant authority or a suitably qualified planning professional.


    Sources, review and changes

    These AI-assisted checks cover published document identity, status, dates and links. They do not decide how policy applies to an individual site, and professional planning review has not been completed.

    Source-check dates describe when we inspected the source. They do not renew automatically when the website is rebuilt. We link to official documents without claiming a licence over them or republishing them.

    Official source register (7 sources)

    First published . Recorded adopted and emerging documents, source dates and stated gaps.

    Report a correction with this page and an official source link.

    Help improve Planning Approvals

    Tell us what you would change (opens in a new tab)